2025-08-23
- Actual Budget
- https://github.com/actualbudget/actual
- docker:
docker run --pull=always --restart=unless-stopped -d -p 5006:5006 -v ~/actual:/data --name my_actual_budget actualbudget/actual-server:latest - Can also run web only at https://app.actualbudget.org/settings with budget imported and exported manually via settings
2025-08-20
- CV for DDAT Corsham
- CV for ticket tailor
2025-08-19
- GOH process as testbed for m3 svelte
2025-08-18
- meet Matthew
- GOH process / m3 svelte
- lots of toolbar bugs exposed
- respond to Insync support
2025-08-17
- check DO K8s upgrade went ok
- report issues with Insync
- thinking about Beeware rclone ui
2025-08-16
- Insynchq is not working for GDrive
- tried unync and readd, no joy
- did not contact support (yet)
- Asked ChatGPT about rclone guis, no great answers
rclone rcd --rc-web-guiok for casual browsing though not very user friendlyrclone mountwith dolphin sounds useful but no sync functionality- Quotes reddit user saying best to get to grips with cli
- rclone cli
- DO permissions require ‘full’ to be able to write (’limited’ even with read/write/delete is not enough)
rclone sync do-kp:knowprocess/tim/ ~/do/tim/rclone sync do-kp:knowprocess/journal/2025 ~/do/journal/2025/rclone sync do-kp:knowprocess/journal/2025
2025-08-15
- m3-svelte
- save to same location opened
2025-08-14
- m3-svelte
- Complete open / new from template integration
2025-08-13
- WCA green open homes
- process thinking
- read ticket tailor API
- m3-svelte
- new process button
2025-08-11 - 12: holiday
2025-08-08
- admin-ng
- add about page inc. blurb, copyright and version.
2025-08-07
- tasks-ng
- complete GitHub Actions to build and deploy
- note that GitHub Packages only stores for 90 days. Not so important for static deploys as K8s containers but… Must build and deploy every 90 days at a minimum - TODO
- complete GitHub Actions to build and deploy
- admin-ng
- back to the start…
- strip libs that have been replaced (e2e)
- progresses angular 12->20
2025-08-04 - 06
- admin-ng
- upgrades (lots!)
- tasks-ng
- started with node 12 and check master is working
ng serveok- login ok
- wrong flowable creds…
- https://blog.angular.dev/the-state-of-end-to-end-testing-with-angular-d175f751cb9c[protractor (e2e test tool) dead]
- https://playwright.dev/docs/protractor[playwrighti migration looks like it may be similar but less deps]
- https://blog.angular.dev/moving-angular-cli-to-jest-and-web-test-runner-ef85ef69ceca[karma too is dead]
- Jest for Node based testing, Web Test Runner for real (browser based) testing.
- Cannot find evidence of this being available yet
- https://angular.dev/guide/testing[Latest test guidance from angular]
- still recommending karma
- For CICD: ng test –no-watch –no-progress –browsers=ChromeHeadless
- new control flow syntax introduced in v17 https://dev.to/vetriselvan_11/angular-20-control-flow-part-1-say-goodbye-to-ngif-ngfor-and-ngswitch-42d8
- completed Angular 20 migration including new control flow syntax, which highlighted model attributes that were used but not declared [interesting]
- figured out that fixing unit tests was going to need to inject mock services containing own data
2025-08-01
flowable plan
- test apps under 7.x: enquiry, send memo, simple todo, others?
- write a script to recreate the todos as new process instance on new install
- make the switcheroo
- investigate event manager to provide circuit breaker and loose coupling between web and bpm
flowable dev env
- flowable-rest (on h2):
docker run -p 8080:8080 flowable/flowable-rest:7.1.0 - admin-ng:
- need to upgrade angular 12 to 20? https://angular.dev/update-guide?v=12.0-13.0&l=1
- but first need to
npm install, which itself is a challenge
- bpaas
- flowable-rest (on h2):